Giloaou 3 Pcs Blank Award Plaques Set
Giloaou 3 Pcs Blank Award Plaques Set
Description
DIY-ready blank wood plaques with a smooth, sanded surface perfect for crafting, painting, and decorating. This value set includes three equally-sized MDF boards, offering ample space for personalization, signage, or wall art. Natural color finish accepts a variety of stains and paints. Dimensions: 7.75" x 9.75".
Item Details
Seller

Nellis Auction
Pickup Location
6520 Westwind Rd, Ste 100
Las Vegas, NV, 89118
Quality
Estimated Retail Price
$18.09
Buyers Premium
15%
Inventory Number
1091485334
Additional Details from the Manufacturer
This item information is coming from the manufacturer. Some of the details may vary from the Nellis Auction listing. Please check the Quality Rating and Notes for information specific to this listing
brand
Giloaoucolor
browndimensions
Item: 9.8 × 7.8 × 0.1 in · Package: 3.15 lbMore features
- Smooth MDF material
- Size: 7.75" x 9.75"
- Quantity: 3 pcs


See the deals
Get in on the action, thousands of new items added daily. Bid and win!
Start bidding now

